White Ceiling

Ivanhoe Grammar -
41 The Ridgeway, Ivanhoe, VIC

Trade Package - Aluminium Windows and Doors

Glazing Scope - 1,150m2

Builder - Building Engineering

Architect - McIldowie Partners

Completed in February 2022 and boasting 4 indoor basketball courts, a 50 meter indoor swimming pool and dedicated weights and fitness room among it's impressive facilities, Ivanhoe Grammar's new Sports and Aquatic Centre is a sight to behold. The school's  previous facilities dated back 60 years, meaning a redevelopment was in dire need.

Ivanhoe Grammar Basketball Stadium_edited.png

Features

20 year Powder Coated Frame Warranty

Double Glazing

Auto Operators

9 & 12mm Argon Gas Spacers

Premium Door Hardware

20220708_135651 (2).jpg

There were numerous glazing parameters to include such as low iron, heat soaking, laminated glass, clear and obscure, as well as heat strengthening, 9 and 12mm black Argon Gas spacers and Low E film. Both Dulux and Interpon powder coat products were utilised, in several different colours all with a 20 year warranty as per the developers specification, The build included fixed and awning windows, hinged doors and door frames and auto operating mechanisms concealed in the ceiling space. 

Ivanhoe Grammar.jpg